Tuesday, December 9, 2008

Kevin Martin's FCC "Dysfunctional"

A Committee on Energy and Commerce Majority Staff report released today (12/09/2008) details the findings of the Committee’s bipartisan investigation relating to the Federal Communications Commission (FCC).

“Our investigation confirmed a number of troubling allegations raised by individuals in and outside the FCC,” the Chairman of the Subcommittee on Oversight and Investigations Bart Stupak (D-MI) said. “The Committee staff report details some of the most egregious abuses of power, suppression of information and manipulation of data under Chairman Martin’s leadership. It is my hope that this report will serve as a roadmap for a fair, open and efficient FCC under new leadership in the next administration.”

“Any of these findings, individually, are cause for concern,” said Rep. John D. Dingell (D-MI), Chairman of the Committee on Energy and Commerce. “Together, the findings suggest that, in recent years, the FCC has operated in a dysfunctional manner and Commission business has suffered as a result. It is my hope that the new FCC Chairman will find this report instructive and that it will prove useful in helping the Commission avoid making the same mistakes.”

The report, titled “Deception and Distrust: The Federal Communications Commission Under Chairman Kevin J. Martin,” is the culmination of a bipartisan investigation into the FCC’s regulatory processes and management practices that was formally launched on January 8, 2008.

Read the Report (4.2 Mb pdf) for the full "scoop" or, listen to todays conference call with Chairman Stupak regarding the report and the investigation (audio).

It's also rather interesting to learn that industry trade magazine RCR Wireless News today declared Chairman Martin this year's most influential wireless player.

And you are still wondering why wireless regulation (and other FCC-managed matters) in the U.S. are so......(insert your own descriptive word here).


NR


Sunday, November 16, 2008

"White Spaces" Rules for TV Spectrum Released

On Friday (11/14/2008) the Federal Communications Commission (FCC) released their long-awaited and highly-debated Rules for the development and operation of so-called television band "white spaces" devices to be authorized under CFR 47 Part 15 sub-part H.


The following is excerpted from the FCC's "White Spaces" Order (FCC 08-260) on ET Docket No. 04-186 and ET Docket No. 02-380):


Introduction - Item 10. All Devices. All unlicensed TV band fixed and personal/portable TV band devices will be permitted to operate on TV channels 21-51, excluding channel 37. In addition, fixed TVBDs that only communicate with other fixed TVBDs will be permitted to operate on channels 2 and 5-20, except that they must avoid operation on channels used by private land mobile radio service (PLMRS), i.e., public safety, and commercial mobile radio service operations on channels in certain markets and areas adjacent to them. Also, in individual markets where there are Private Land Mobile Radio Service or Commercial Mobile Radio Service (PLMRS/CMRS) operations on channels 14-20, two channels in the range 21-51 will be reserved for operation by wireless microphones such that TVBDs will not be permitted on those channels. This plan for channel use is consistent with the requests of the various white space proponents and would reserve channels for a "safe harbor" for operation of wireless microphones and ensure protection of the public safety and other land mobile services that use channels 14-20. At this time, we are only permitting fixed TVBDs to operate on channels not that are not immediately next to (first adjacent on either side of) the channel of a TV station; personal portable devices will be allowed to operate on first adjacent channels to a TV station subject to the power limitation indicated above. All unlicensed TV band devices will be required to limit their out-of-band emissions in the first adjacent channel to a level 55 dB below the power level in the channel they occupy, as measured in a 100 kHz bandwidth. In addition, all TVBDs will be required to comply with a more stringent out-of-band emissions band at the edges of channels 36 and 38 that are adjacent to channel 37 in order to protect medical telemetry devices on that channel 37. Fixed devices will also be required to periodically transmit a signal with their identification when they are operating. This will facilitate identification of sources of interference. The database system for fixed stations and personal/portable devices with geo-location and database access capability will be managed by a database manager or managers selected by our Office of Engineering and Technology.


Full text of Order:

http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-08-260A1.pdf


It'll be at least a year or more until any products or services are available to utilize this spectrum (none have been certificated by the FCC as yet and, you can probably count on both proponents and opponents continuing their war of words and legal challenges), so, this might be a good time to suggest that all potential "white spaces" users familiarize themselves with Appendix B of the Order which contains the Final "White Spaces" Rules and the new Part 15 Sub-Part H on Television Band Devices.


NR

Monday, September 1, 2008

Are You Ready for FCC Part 90 UHF/VHF Radio System "Narrowbanding"?

In December 2004, the FCC issued an Order mandating that all Part 90 business, educational, industrial, public safety, and state and local government VHF (150 – 174 MHz) and UHF (421 – 512 MHz) private land mobile radio (PLMR) licensees convert their radio system operations from legacy wideband (25 kilohertz) to narrowband (12.5 kilohertz or equivalent) operation by Jan. 1, 2013.

Contrary to what some may have heard or been led to believe, the Order does not require licensees to change to new radio frequencies or different frequency bands, nor does it require moving from analog to digital or from a conventional to a trunked radio system. (These are, though, alternative radio system options that some licensees may want to more fully explore with the guidance of a qualified radio communications system professional.) The Order also doesn’t mean that licensees need to replace all their current radio system equipment — only any soon-to-be-non-compliant equipment.

What the FCC’s mandate does require is that all wideband-only conventional or trunked VHF and UHF radios, including handheld portables, vehicle-mounted mobiles, dispatcher stations, wireless data, telemetry, or supervisory control and data acquisition (SCADA) link radios (called subscriber radios) and any associated wideband-only conventional or trunked base or repeater stations (called infrastructure radios), be replaced with narrowband capable equipment prior to the 2013 date to continue legal use of Part 90 radio frequencies beyond that date. FCC radio system licenses must also be modified to reflect the change to narrowband emissions and operation.

Migration Steps

Over the last several years, in response to the mandate, many licensees have started the narrowband migration process by deploying dual-mode subscriber radios — those capable of both wideband and narrowband operation — as new radios have been added to their systems or as older wideband-only radios were lost, damaged beyond repair or otherwise removed from service. While this strategy is a practical, cost-effective approach, particularly by those with large numbers of subscriber radios in their fleets or those with multiple radio frequencies, base stations and repeaters in their systems, this method addresses only the first step of a multi-step process.

Unless a radio system is initially implemented as a narrowband system - as most new systems have been during the past six to nine years - many dual-mode replacement subscriber radios deployed into pre-mandate or older, conventional or trunked VHF or UHF radio systems have typically been programmed for wideband rather than narrowband operation. This best-practices method was necessary to retain compatibility with existing wideband subscriber and infrastructure radios in use in those systems. (NOTE: the mixing of wideband and narrowband radios on the same frequency of a system is generally not encouraged nor recommended. Doing so has the potential to render most voice - and especially data - transmissions between wideband and narrowband radios unintelligible, distorted or unreliable). The method also allowed the expense of replacing infrastructure radios at the same time to be deferred, as the year 2013 seemed a long way off.

In many instances, however, the need to address the deferred replacement of wideband-only infrastructure radios may have inadvertently been overlooked or even forgotten by some licensees or radio system managers. This is particularly true when it comes to the many smaller business, educational, and industrial users of two way radio who typically don't keep up with current FCC Rules or the responsibilities that go along with being a Part 90 licensee, and, who quite often simply take the use and benefit of their radio systems for granted. This blog post is a reminder to all licensees that until all subscriber and infrastructure radios are fully migrated to narrowband operation, many radio systems may still be operating in the wideband mode, which is legal only until Jan. 1, 2013.

Migration Planning

Has your company or organization developed a migration plan and budget to address the next steps necessary to complete the narrowband migration process and become fully FCC compliant? These steps include replacing any remaining wideband-only subscriber radios still being used; procuring and installing narrowband base stations, repeaters or other infrastructure radios as needed; preparing a well-planned, coordinated approach to re-programming all radios to narrowband operation; and modifying a radio station license to reflect any new emissions designators. Click here for more migration suggestions.

The 2013 date isn’t that far away, particularly if funding needs to be secured and budgets prepared or, when any operations dependent on uninterrupted radio communications may be jeopardized. Companies and organizations that recognize and appreciate the value of their Part 90 two-way voice and data radio communications systems are advised not to wait until the last minute to begin or complete the narrowbanding process. By waiting, they are risking not only the loss of use of their current radio frequencies, but the return on the investment (ROI) and associated benefits provided by their radio system equipment as well.

More Information

Follow these two links to official documents and complete background information on the FCC’s narrowbanding mandate:

http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-04-292A1.pdf (2004 Order)

http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-271692A1.pdf (2007 Update)

or, for on-line discussions regarding the mandate, licensees and other interested parties are invited to join the LMR Narrowbanding Yahoo! Group


NR
(Re-post2)

Saturday, May 3, 2008

Sprint Nextel's latest setback a win for Public Safety

Sprint Nextel must cease operations in certain portions of its wireless airwaves by June 26, 2008 to stop the interference its Motorola made iDEN cellular network causes to public-safety two way radio communications networks.

The company must comply with
an order issued by the Federal Communications Commission in September of last year as part of the Commissions long-running efforts to resolve the interference issues by 'rebanding' the 800 MHz band, said the U.S. Court of Appeals in Washington on May 2.

In the Appeals Court opinion, a three-judge panel rejected Sprint's claim that the FCC's Order would "cripple the company's wireless network". Sprint, the third-biggest U.S. mobile-phone company, had also argued that the FCC order was "arbitrary and capricious" and would harm public safety.


Hurray! After almost 10 years of debate and political maneuvering,
it's about time.


NR